Show Navigation

ClearEyePhoto

  • Portfolio
  • About
  • Contact
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area

ClearEyePhoto

Search Results

41 images

  • Facebook
  • Twitter
x
Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)

Loading ()...

  • Nate checks the alignment
    32-RaisingPavillionWalls-028.jpg
  • Nate supervises tying the sail to the yard
    RigUp2011-011.jpg
  • 50-RaisingPavillionWalls-046.jpg
  • June 16, 2011. Cutting deck frames with a chain saw and jig.
    Boatbuilding4-006.jpg
  • June 16, 2011. Cutting deck frames with a chain saw and jig.
    Boatbuilding4-004.jpg
  • June 16, 2011. Cutting deck frames with a chain saw and jig.
    Boatbuilding4-003.jpg
  • June 16, 2011. Cutting deck frames with a chain saw and jig.
    Boatbuilding4-002.jpg
  • June 16, 2011. Cutting deck frames with a chain saw and jig.
    Boatbuilding4-001.jpg
  • The gundalow Captain Edward H. Adams waits to join the tall ship Gazela at the State Pier in Portsmouth NH Harbor, for the Sail Portsmouth festival. The I-95 Piscataqua River Bridge is in the background.
    EHAdamsAtSailPortsmouth-010.jpg
  • After all walls are in place a corner weight is lowered into position.
    48-RaisingPavillionWalls-044.jpg
  • Final positioning nudges
    35-RaisingPavillionWalls-031.jpg
  • Final positioning nudges
    34-RaisingPavillionWalls-030.jpg
  • Lifting and moving the vertical wall into position
    28-RaisingPavillionWalls-024.jpg
  • Last minute checks before moving the upright wall into final position
    26-RaisingPavillionWalls-022.jpg
  • This time the wall is raised to vertical position without incident.
    25-RaisingPavillionWalls-021.jpg
  • Lowering the wall to reconfigure the straps.
    19-RaisingPavillionWalls-015.jpg
  • The wall continues to bow as it is lifted using the initial strap configuration.
    17-RaisingPavillionWalls-013.jpg
  • Attaching straps to the west sidewall
    12-RaisingPavillionWalls-008.jpg
  • Attaching straps to the west sidewall
    09-RaisingPavillionWalls-005.jpg
  • June 17, 2011
    Boatbuilding4-020.jpg
  • June 16, 2011. Cutting deck frames with a chain saw and jig.
    Boatbuilding4-005.jpg
  • BoatBuilding2-002.jpg
  • Final positioning nudges
    33-RaisingPavillionWalls-029.jpg
  • As it is raised, the wall begins to bend/bow in the center.
    16-RaisingPavillionWalls-012.jpg
  • Ready to try hoisting the wall.
    14-RaisingPavillionWalls-010.jpg
  • Unloading the second and larger trailer.
    PavillionLumberDeliveryDay-005.jpg
  • Raising the yard with the windlass and strong bodies!
    RigUp2011-030.jpg
  • Unloading the second and larger trailer.
    PavillionLumberDeliveryDay-012.jpg
  • Unloading the second and larger trailer.
    PavillionLumberDeliveryDay-010.jpg
  • Unloading the second and larger trailer.
    PavillionLumberDeliveryDay-006.jpg
  • Ready to raise the yard!
    RigUp2011-026.jpg
  • The yard is half way up to its swivel point on the stump mast
    RigUp2011-025.jpg
  • Preparing to hoist the yard up to its swivel point on the stump mast
    RigUp2011-024.jpg
  • Preparing to hoist the yard up to its swivel point on the stump mast
    RigUp2011-023.jpg
  • Preparing to hoist the yard up to its swivel point on the stump mast
    RigUp2011-022.jpg
  • Preparing to hoist the yard up to its swivel point on the stump mast
    RigUp2011-020.jpg
  • The sail is ready to attach to the yard
    RigUp2011-008.jpg
  • The sail is ready to attach to the yard
    RigUp2011-007.jpg
  • Carrying the rolled sail onto the Gundalow
    RigUp2011-006.jpg
  • Carrying the rolled sail onto the Gundalow
    RigUp2011-004.jpg
  • Carrying the rolled sail onto the Gundalow
    RigUp2011-003.jpg