Show Navigation

ClearEyePhoto

  • Portfolio
  • About
  • Contact
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area

ClearEyePhoto

Gundalow Galleries All Galleries
  • Facebook
  • Twitter
x
Add to Cart Download

25 images Created 22 May 2011

Gundalow II Construction, May 2011

Early activities in the construction of the new Gundalow at the boat yard in Strawbery Banke, Portsmouth, NH
View: 100 | All

Loading ()...

  • Stock for trunnels piled in the tool shed
    01-BoatBuildingMay-001.jpg
  • Paul and Joe cutting properly angled pieces to make the frames for the hull. Paul tells me that "frame" is the proper nautical term for what mostt folks would think of as a rib of the boat.
    02-BoatBuildingMay-002.jpg
  • Ralph Morang photographs Paul and Joe cutting properly angled pieces to make the frames for the hull. Paul tells me that "frame" is the proper nautical term for what mostt folks would think of as a rib of the boat.
    03-BoatBuildingMay-003.jpg
  • Paul and Joe cutting properly angled pieces to make the frames for the hull. Paul tells me that "frame" is the proper nautical term for what mostt folks would think of as a rib of the boat.
    04-BoatBuildingMay-004.jpg
  • Cliff shapes a trunnel
    05-BoatBuildingMay-005.jpg
  • Cliff shapes a trunnel
    06-BoatBuildingMay-006.jpg
  • Dennis trims a trunnel
    07-BoatBuildingMay-007.jpg
  • Paul begins to chiselling out the propeller shaft
    08-BoatBuildingMay-008.jpg
  • Paul begins to chiselling out the propeller shaft
    09-BoatBuildingMay-009.jpg
  • Dennis works on chiselling out the propeller shaft
    10-BoatBuildingMay-010.jpg
  • Paul and Dennis chiselling out the propeller shaft
    11-BoatBuildingMay-011.jpg
  • The shaft has been chiseled and can now be drilled out to final size.
    12-BoatBuildingMay-012.jpg
  • Dennis prepares to drill out the propeller shaft.
    13-BoatBuildingMay-013.jpg
  • Dennis drilling out the propeller shaft.
    14-BoatBuildingMay-014.jpg
  • Dennis drilling out the propeller shaft.
    15-BoatBuildingMay-015.jpg
  • Dennis drilling out the propeller shaft.
    16-BoatBuildingMay-016.jpg
  • Dennis prepares check out the results after drilling the propeller shaft.
    17-BoatBuildingMay-017.jpg
  • The shaft ha been drilled and is ready to prime.
    18-BoatBuildingMay-018.jpg
  • Painting the propeller shaft with Ablative Antifouling bottom paint
    19-BoatBuildingMay-019.jpg
  • Joe envisions a boat framing stock in a raw piece of timber.
    20-BoatBuildingMay-020.jpg
  • Joe begins work on a  rough cut piece of live oak to turn it into lumber that will go into the hull of the boat.
    21-BoatBuildingMay-021.jpg
  • Hammering trunnels to put together a hull frame (think "rib").
    22-BoatBuildingMay-022.jpg
  • Trimmeng trunnel ends after they've been driven trhough the wood
    23-BoatBuildingMay-023.jpg
  • Trimmeng trunnel ends after they've been driven trhough the wood
    24-BoatBuildingMay-024.jpg
  • The bow begins to take shape
    25-BoatBuildingMay-025.jpg